13168845147 specialized production activities cut off the macro partition screen factory, Guangdong Foshan up to 24-hour hotline, activity screens, mobile screens, mobile partition, sliding and folding doors, folding sliding doors, sales of mobile screens hanging round rails.
Activities cut off, mobile screens whenever you need a large space is divided into a small space or a small space with National Cheng Kung University space with general wall features movable wall. Can play a pluripotent one hall, one room multi-purpose role.
An overhead track: simply track installed on the floor on or load-bearing beam or truss; trackless floor, no damage on the ground
2. Stable security: cut off after a solid and reliable, easy to swing;
Soundproofed environmental: the effect of noise, the maximum noise factor of up to 50dB;
4. Energy-saving insulation: excellent insulation properties, depending on attendance rate, a large space is divided into a small space, in order to reduce the power consumption of air conditioning;
Efficient fire protection: efficient fireproof material, fire performance is good;
Nice: the surface of any decoration, and indoor unified decorative effect;
7. Retractable flexible: partition Millia promote flexible, one blocking the entire process can be completed;
Convenient collection: the collection plate, partitions can be hidden in a dedicated storage cabinet, does not affect the overall appearance;
9. Wide range of applications: a wide range of applications, can be applied to the conference hall, exhibition halls, restaurants, high-clean factories and office and other places;
10, it can be any space quickly separated, have good sound insulation and fire retardant function, applied to a large convention center, hotel function rooms, business meeting spaces, offices and government agencies, and other indoor places
Model |
Weight (kg/m) |
Fire Rating(min) |
STC Performance |
Specification |
Carrier |
Thickness (mm) |
Width(mm) |
Height(mm) |
Top Seal(mm)/ Pressure(kg) |
Bottom Seal(mm)/ Pressure(kg) |
LCP stretch (mm) |
DL65-32 |
22 |
60 |
32db |
65 |
680-1212 |
2000-4500 |
22.5/35 |
22.5/35 |
140 |
65# |
DL 65-38 |
27 |
60 |
38db |
65 |
680-1212 |
2000-4500 |
22.5/35 |
22.5/35 |
140 |
DL 65-45 |
35 |
60 |
45db |
65 |
680-1212 |
2000-4500 |
22.5/35 |
22.5/35 |
140 |
Technical data of Type 80 movable partition :
Model |
Weight (kg/m) |
Fire Rating(min) |
STC Performance |
Specification |
Carrier |
Thickness (mm) |
Width(mm) |
Height(mm) |
Top Seal(mm)/ Pressure(kg) |
Bottom Seal(mm)/ Pressure(kg) |
LCP stretch (mm) |
DL 80-40 |
30 |
60 |
40db |
80 |
680-1212 |
2000-5500 |
22.5/35 |
22.5/35 |
140 |
80# |
DL 80-45 |
38 |
60 |
45db |
80 |
680-1212 |
2000-5500 |
22.5/35 |
22.5/35 |
140 |
DL 80-48 |
47 |
60 |
48db |
80 |
680-1212 |
2000-5500 |
22.5/35 |
22.5/35 |
140 |
Technical data of Type 100 movable partition :
Model |
Weight (kg/m) |
Fire Rating(min) |
STC Performance |
Specification |
Carrier |
Thickness (mm) |
Width(mm) |
Height(mm) |
Top Seal(mm)/ Pressure(kg) |
Bottom Seal(mm)/ Pressure(kg) |
LCP stretch (mm) |
DL 100-43 |
38 |
60 |
43db |
100 |
680-1219 |
2000-7500 |
30/40 |
30/40 |
140 |
100# |
DL 100-48 |
46 |
60 |
48db |
100 |
680-1219 |
2000-7500 |
30/40 |
30/40 |
140 |
DL 100-53 |
55 |
60 |
53db |
100 |
680-1219 |
2000-7500 |
30/40 |
30/40 |
140 |
How to select the suitable movable wall for your site?
We have 5 types of movable wall , 65type , 80type , 100type and 125 ultra-high type . You can choose the right
movable wall upon the Height and Soundproof requirement as following,
65 type— Max height 3.5m, soundproof: 38dB to 43dB
80 type— Max height:5.5m,Soundproof: 43dB to 53dB
85 type— Max height:5.5m,Soundproof: 43dB to 53dB
100 type— Max height:7m,Soundproof: 43dB to 58dB
125ultra-height — Max height:17m,Soundproof : 38dB to 48dB
What you should do on site ?
A beam(truss) should built on site for track installation . The min distance leaving for track installation from false
ceiling to top ceiling is 200mm .
How to install ?
We will provide the installation manual and video guiding the installation job . We can also dispatch the installation
engineer supervising the installation as request .
What is lead time ?
The lead time is 7 days to 10 days .
How to transport ?
Sea transport is a common mode of transportation. In an emergency, can be air freight.
How do the goods packing ?
Corrugating paper packaging, MDF batten cover all around corner .
The movable wall panel and track, fittings will be packed separately .
What is Procurement procedure ?
Firstly , send us the shop drawings(if the shop drawings is not available , you can tell us the height from false ceiling
to finished floor and width from wall to wall)
Secondly , we offer you the movable wall layout drawings for your confirmation
Thirdly , we quote the movable wall in accordance with confirmed drawings .